Masterplan 1 Pre-application consultation


Cardiff Peninsula Consortium Limited is intending to apply to Cardiff Council for outline planning permission for a mixed-use scheme to provide new homes, business space, and a mix of complementary uses, including leisure, food and drink, hotel and retail, with associated landscaping, public realm and highway works.
As part of our pre-application consultation, this website allows you to view the draft planning application documents and provides contact information for you to give feedback on the proposals.
Documents
Environmental Statement – Introduction
Environmental Statement – Site and Surroundings
Environmental Statement – The Proposed Development
Environmental Statement – Consultation, Alternatives and Scheme Evolution
Environmental Statement – Approach
Environmental Statement – Biodiversity
Environmental Statement – Townscape and Visual Impact
Environmental Statement – Transport
Environmental Statement – Ground Conditions
Environmental Statement – Noise & Vibration
Environmental Statement – Air Quality
Environmental Statement – Water and Drainage
Environmental Statement – Wind Microclimate
Environmental Statement – Climate Change
Environmental Statement – Human Health
Environmental Statement – Socio-economics
Environmental Statement – Summary of Proposed Mitigation and Residual Effects
Environmental Statement – Non-Technical Summary
ES Appendix 1.1 – Glossary of Terms
ES Appendix 1.2 – EIA Statement of Competence
ES Appendix 2.1 – Site Location Plan
ES Appendix 3.1 – Plans Schedule
ES Appendix 5.1 – Scoping Report
ES Appendix 5.2 – Scoping Opinion
ES Appendix 6.1 – Preliminary Ecological Appraisal 2022
ES Appendix 6.2 – Ecological Appraisal 2023
ES Appendix 6.3 – Bat Activity report 2023
ES Appendix 6.4 – Otter report 2024
ES Appendix 6.5 – Breeding bird survey report 2023
ES Appendix 6.6 – Wintering bird survey report 2023
ES Appendix 6.8 – Invertebrate Assessment 2022
ES Appendix 6.9 – Invertebrate Assessment 2023
ES Appendix 6.10 – Vegetation survey report 2023
ES Appendix 6.11 – Bat presence absence report 2024
ES Figure 6.2 – Statutory Sites
ES Appendix 7.1 – Location Plan
ES Appendix 7.2 – Photographs Viewpoint 1-2
ES Appendix 7.3 – Zone of Theoretical Visibility – Landform
ES Appendix 8.1 – Transport Assessment
ES Appendix 8.2 – Framework Travel Plan
ES Appendix 9.1 – A2 Site Investigation, Cardiff Bay Peninsula Phase I Desk Study, June 2024
ES Appendix 9.3 – Summary of Contamination Test Results from the 2024 A2 Site Investigation
ES Appendix 9.4 – Preliminary 2024 Ground Gas Risk Assessment Calculations
ES Appendix 9.5 – CSM – Potential Pollutant Linkages and Risk Assessment
ES Appendix 9.6 – Risk Assessment Classifications and Matrix
ES Appendix 10.1 – Noise & Vibration Glossary of Acoustic Terms
ES Appendix 10.2 – N&V Baseline Survey
ES Appendix 10.3 – N&V Construction Noise and Vibration Assessment
ES Appendix 10.4 – N&V Road Traffic Noise Assessment
Figure 10.1 – Noise Monitoring and Sensitive Receptor Locations
Figure 10.2 – Noise Contour Plot Proposed Development – Daytime
Figure 10.3 – Noise Contour Plot Proposed Development – Nighttime
ES Appendix 11.1 – Air Quality Glossary of Terms
ES Appendix 11.2 – Legislation, Policy & Guidance
ES Appendix 11.3 – 2022 Cardiff Windrose
ES Appendix 11.4 – Traffic Data
ES Appendix 11.5 – Modelled Receptors & Backgrounds
ES Appendix 11.6 – Model Verification
ES Appendix 11.7 – Modelled Results
ES Appendix 12.1 – NRW Maps for Planning
ES Appendix 12.2 – Proposed Masterplan – Building Uses – South Rev 03
ES Appendix 12.3 – Flood Consequences Assessment
ES Appendix 12.4 – SAB meeting minutes
ES Appendix 12.5 – Drainage Strategy Report
ES Appendix 12.6 – Welsh Water
ES Appendix 13.1 – Wind Microclimate Assessment
Green Infrastructure Statement
Sustainability & Energy Assessment
Drawings and Plans
PROPOSED REALIGNMENT OF EMPIRE WAY WITH NEW ACCESS ARRANGEMENT
PROPOSED REALIGNMENT OF EMPIRE WAY – PLAS BOWLES
PROPOSED REALIGNMENT OF EMPIRE WAY – PLAS BOWLES
PROPOSED ACCESS ARRANGEMENT DESIGN AND SWEPT PATH ANALYSIS – PROPOSED CONTINUATION OF DAN DON
PROPOSED ACCESS ARRANGEMENT DESIGN OFF INTERNATIONAL DRIVE FERRY ROAD ROUNDABOUT
Proposed Parameter 3D View – East
Proposed Parameter 3D View – North
Proposed Parameter 3D View – South
Proposed Parameter Elevation North-East
Proposed Parameter Elevation North-West
Proposed Parameter Elevation South-East